Below is a record of jobs finished after building and renovation work, listed with the type of property, the scope handled, and what the crew found on site. It gives a realistic picture of what post-renovation cleaning actually involves before a space is handed back to a client.

Full clean after a kitchen and bathroom refit, covering plaster dust on skirting boards, grout residue on new tiles, and paint spatter on window frames left by the contractors.

Pre-handover clean for a three-bedroom new build, including removal of protective film from worktops, window sill sanding residue, and construction footprints on laminate flooring.

Clean-up after an open-plan office refit covering carpet tile edges, glass partition smudges from silicone sealant, and cable trunking dust before the desks were delivered.

Post-build clean for a loft conversion, dealing with fine sawdust worked into new floorboards, plasterboard scraps behind radiators, and a fixed skylight coated in joint compound splashes.

Detail clean after a full bathroom strip-out and refit, removing tile adhesive haze, sealant threads around the new shower screen, and grinder dust from the extractor fan housing.

Clean after a rear kitchen extension, addressing bifold door track debris, cement dust on the new patio threshold, and fingerprints on freshly fitted cabinetry.

Opening-ready clean for a retail unit after shopfitting, covering shelving unit dust, adhesive residue on shopfront glass, and cardboard packing debris left in stockroom corners.

Room-by-room clean across a full house refurbishment: rewiring dust in wall cavities, old paint chips on stripped floorboards, and a general film of grime left by weeks of trade traffic.

Quick-turn clean after a landlord's mid-tenancy refresh, focused on wardrobe interiors coated in plaster dust, skirting board paint drips, and window tracks packed with builders' grit.

Handover clean for a timber garden room after construction, removing sawdust from skirting joints, sealant smears on glazing, and roofing felt granules tracked across the new flooring.

Clean of a tenement common stairwell after repainting and handrail repairs, clearing masking tape residue, paint drips on stone steps, and dust settled on light fittings.

Deep clean of a converted basement space, addressing damp-proofing dust, cement powder in corners, and residue from the tanking membrane left on exposed pipework.
| Category | Typical scope | Usual timeframe |
|---|---|---|
| Flat / Whole-House | Full internal clean, all rooms, dust and residue removal | 1-2 days |
| New Build / Extension | Protective film removal, worktop and fitting clean | Half to 1 day |
| Office / Retail Fit-Out | Floor, glass and fixture clean before occupancy | 1 day |
| Bathroom / Kitchen Refit | Tile, grout and sealant residue removal | Half day |
| Common Areas / Garden Structures | Stairwells, exteriors, outbuildings | Half to 1 day |
Typical reply time to a new enquiry is around 3 hours. Get in touch with details of the property and the works carried out, and we will confirm a scope and timing.
Get in touch